Stone Cladding vs Face Brick vs Plaster: Which Look?

November 6, 2026 · I.B.S Construction
Ceiling boards fixed to timber structure before skimming; alt skimming

Stone cladding vs face brick vs plaster and paint is the exterior finish decision most South African homeowners face, and the right answer depends far more on maintenance appetite than on looks.

All three can look excellent. They cost very different amounts, and they behave very differently over ten years. Here is the honest comparison.

What each finish actually is

  • Stone cladding: a decorative layer of natural or reconstituted stone fixed to an existing wall. It is a finish, not structure.
  • Face brick: the wall itself is built in a brick designed to be left exposed, with neatly pointed joints. No plaster, no paint.
  • Plaster and paint: stock brick built, plastered both sides, primed and painted. The most common finish in South Africa.

The key structural difference is that stone cladding goes onto a wall you already have, while face brick and plaster are decisions made when the wall is built. Cladding is therefore the only one of the three that retrofits easily onto an existing house.

Cost: stone cladding vs face brick vs plaster

These are not like-for-like numbers, so read them carefully.

  • Stone cladding: R990 to R2,750 per m2 of wall face, supplied and installed onto an existing wall
  • Brick-effect cladding tiles: R440 to R880 per m2, a cheaper way to a similar look
  • Face brick wall, built: around R354 per m2 of wall on a 100m2 single-skin comparison, including bricks, mortar and labour
  • Plastered and painted stock brick wall, built: around R384 per m2 on the same comparison, including plaster, primer, paint and three trades

Two things stand out. First, stone cladding is by a distance the most expensive finish per square metre. Second, face brick is not the budget-buster people assume – once you price the plaster, primer, paint and the extra trades, it can come out slightly cheaper than plastering from day one.

Why plaster looks cheaper than it is

Stock bricks are far cheaper than face bricks, so the material line looks appealing. Then a 15mm plaster coat goes on both sides, primer soaks into raw plaster, premium exterior paint goes over that, and three separate trades have to be booked and coordinated. That is where the saving disappears.

Maintenance over ten years

This is the column that decides the argument for most homeowners.

  • Face brick: essentially nothing. Occasional washing, and repointing only if joints fail. No repainting, ever.
  • Stone cladding: low but not zero. Annual rinse, joint checks, resealing every few years on porous stone.
  • Plaster and paint: repainting on a cycle, typically every five to eight years depending on exposure, plus crack repairs.

A repaint is not a small job. Preparation, primer, two coats and access on a whole house is a meaningful recurring cost, and coastal and high-UV positions shorten the cycle. Over twenty years, plaster and paint is the most expensive of the three to own, even though it starts cheapest. Ours is a painting service that does this work regularly, and the repaint cycle is real.

Where each one fails

  • Face brick: efflorescence, and mortar joints that eventually need repointing on exposed elevations
  • Stone cladding: debonding where it was fixed to unsound plaster, or salt damage on porous stone near the sea
  • Plaster and paint: hairline cracking, blistering where damp gets behind it, and fading

Look and where each one suits

Cost aside, they say different things.

  • Stone cladding: texture, depth and shadow. Strongest used selectively – an entrance, a boundary pier, a chimney breast, a feature elevation.
  • Face brick: honest and traditional, with a colour that never needs refreshing. Best on whole elevations rather than patches.
  • Plaster and paint: the most flexible. Any colour, any time, and easy to change when tastes move.

The common mistake with stone is using too much of it. A whole house in cladding can read as heavy and dated; the same stone on one wall against smooth plaster looks deliberate and expensive.

The verdict

  1. Building new and want the lowest lifetime cost: face brick. Cheapest to run, and competitive to build.
  2. Building new and want colour flexibility: plaster and paint, budgeting for a repaint every five to eight years.
  3. Upgrading an existing wall: stone cladding, since it is the only one that retrofits without rebuilding.
  4. Want the stone look on a budget: brick-effect or reconstituted cladding at R440 to R880 per m2.
  5. Coastal and exposed: face brick or dense stone with stainless fixings. Paint has the shortest life here.

Most homes end up with a mix, and that is usually the right answer. Plaster on the bulk of the elevations, stone on one or two features that catch the eye. Our stone cladding complete guide covers the cladding side in more depth, and stone cladding prices Cape Town breaks the rates down by material.

Getting a straight comparison for your house

Ask for all three priced on the same elevation, with the maintenance cycle spelled out. A quote that only shows the day-one figure hides the difference that actually matters. Cladding and masonry product guidance is published by the Concrete Manufacturers Association.

We do all three – cladding through our stonework service, plus brickwork, plastering and painting – so we can price the comparison honestly rather than steering you to one trade. Assessments are free with no call-out fee. Send us photos of the elevation and we will quote the options side by side.

Frequently asked questions

Is stone cladding more expensive than face brick?

Considerably. Natural stone cladding runs R990 to R2,750 per square metre supplied and installed, while a face brick wall works out around R354 per square metre including bricks, mortar and labour on a 100m2 single-skin comparison. They are not identical products though – cladding is a finish over an existing wall, face brick is the wall itself.

Is face brick cheaper than plaster and paint?

It can be, once everything is counted. On a 100m2 single-skin wall, face brick totals roughly R35,384 against about R38,396 for plastered stock brick with primer and paint. Stock bricks are much cheaper, but plaster materials, primer, premium paint and three separate trades add the difference back and then some.

Which exterior finish needs the least maintenance?

Face brick. It needs no repainting at all, just occasional washing and repointing if joints eventually fail. Stone cladding is low maintenance but needs annual rinsing, joint checks and periodic resealing on porous stone. Plaster and paint needs repainting every five to eight years, which makes it the most expensive to own long term.

Can you put stone cladding on an existing wall?

Yes, and that is its main advantage over the other two. It fixes onto sound brick, block, concrete or well-bonded plaster without rebuilding anything. Paint has to be removed first because adhesive will not bond through it, and any hollow-sounding plaster must be cut out and made good beforehand.

Should I clad the whole house in stone?

Usually not. A full house in stone tends to read as heavy and dates quickly, and at R990 to R2,750 per square metre it is an expensive way to get there. Most homes look better with stone used selectively – an entrance, a chimney breast, a boundary pier or one feature elevation – against smooth plaster elsewhere.